Massachusetts · 310 CMR 15.000

Pass Title 5.
Close your sale.

Certified septic system inspections for Massachusetts property transfers — thorough, on schedule, and filed with your local Board of Health.

Licensed MA System Inspector· Reports filed to MassDEP & Board of Health· Typical turnaround 2–3 weeks
Title 5Certified inspections under 310 CMR 15.000
~2 hrsTypical on-site inspection
2 yrReport validity (3 yr w/ pump records)
P.E.Inspections by a licensed civil engineer

What we do

Everything between listing and closing.

One call covers the inspection, the paperwork, and the coordination — so a septic system never holds up your transaction.

01

Title 5 inspections

Full system evaluation for property sales and transfers. Tank, distribution box, and leaching field opened, assessed, and certified pass / conditional / fail.

02

As-built documentation

Locating and sketching undocumented systems, pulling Board of Health records, and producing the as-built your closing attorney needs.

03

Coordination & consult

Pumping, water testing, and town fees handled on your behalf. Failed system? Engineering guidance on repair vs. upgrade and next steps.

Cost worksheet

Estimate your inspection.

Answer three quick questions for a ballpark range. It's an estimate, not a binding quote — every property is a little different underground.

Title 5 base inspection$475
Estimated range$371$580

Estimate only. Final price is confirmed after a quick look at the property and your town's requirements.

Get this in writing

Request a quote

Tell us about the property.

Send the details and you'll get a firm quote and a scheduling window back, usually same day.